Waddesdon C of E School - Washroom Refurbishment - Brookhouse
Waddesdon C of E School had issues with poor behaviour in their toilets. There was a shortage of Girls toilets and over queuing outside. The Boys toilets had more than enough capacity.

Poor behaviour in their toilets

Shortage of Girls toilets

Over queuing outside


How Brookhouse created spacious and modern school washrooms
Brookhouse turning the washrooms into one washroom and creating an opening to the corridor meant that supervision and visibility into the area reduced the behaviour issues. This along with our unique school floor to ceiling cubicle system made in solid grade laminate and bolt through hardware we were able achieve the durabilty required. By making the washrooms Unisex also spread out the demand and unutilized all the cubicles.

Washroom Design

Space Planning/3D Visuals

Dividing Wall Removed & Corridor Opening Created

Floor to Ceiling Solid Grade Cubicle IPS Sytem

Decoration & Hygiene Wall Cladding

Suspended Ceilings
Client Name | School Name































































