St Marylebone C of E School- Washrooms Refurbishment - Brookhouse
St Marylebone C of E school desperately needed a refurbishment of their existing washrooms. They needed to do this ASAP and could not wait until the next summer holidays to get this work done. The school were also experiencing student behaviour issues due to the standard height cubicles and sinks currently in their washrooms.

Student behaviour issues

Standard height cubicles

Short Deadline


How Brookhouse created modern and robust washroom
Firstly, Brookhouse needed to look at how the project could be carried out with as little disruption to the school as possible. The half-term holiday was identified as a potential time period to work around. A very tight and detailed project critical path was created and the works were carried out one week on either side of the holidays. It was important that there were still facilities during the term time and the Year 12/13 washroom started the week before the holidays and was completed at the end of the break. The disabled/visitor toilet was refurbished during the holidays and the Years 7/8 toilet started in the holidays and finished one week into the term time.
Working during the term-time is what Brookhouse specialises in. We are able to be successful at this because of our understanding and experience of how schools operate and the discipline of our workforce which is enhanced DBS certified. We created a design concept with full height cubicles to reduce the issues they were having and also specified a trough and automatic infrared taps to stop the students from filling up the basins and making them overflow. The solid grade laminate school washroom system has floor track both on the pilasters and the partitions to achieve an extremely robust washroom that will last for years to come. All fittings are also bolted through to ensure no damage to the laminate.

Washroom Design & Consultancy

Full height Solid Grade Laminate School Washroom Cubicles

Full Height Solid Grade Laminate IPS

Decoration & Hygiene Wall Cladding

Electrics and Lighting

Automatic Taps
Everything You Need,
All in One Place
Consultation
We help you make confident, informed decisions with sector-specific advice, site audits, and layout planning — saving time, avoiding costly missteps, and unlocking smarter project outcomes.
Design
Our in-house team uses 3D site scans, Revit plans, and walkthrough visuals to show you exactly what you’re getting — before anything is built. That means better compliance, better function, and fewer surprises.
Financing Support
We offer funding guidance, grant application help, and asset finance options, plus our own Furniture Support Fund to reduce upfront spend and help you upgrade what matters most.
Refurbishment
(Full Fit-Out)
We deliver complete turnkey refurbishments, managing everything from rip-out and M&E to ceilings, floors, and decoration — all handled in-house for maximum control and minimal disruption.
FF&E Packages
We supply fully specified fitted and loose furniture packages tailored to each space — science labs, ICT rooms, classrooms, libraries and more — designed to perform for years to come.
Manufacture
All our fitted joinery and FF&E is made in our own UK facilities and certified to BS EN 16121: ensuring exact fit, shorter lead times, and long-term durability you can trust.
Installation
Our trusted installation teams deliver with speed, precision, and care. From fitted walls and washrooms to complete block refurbishments, we control the quality start to finish.
Aftercare & Support
We offer responsive aftercare, warranty management, future upgrades and loose furniture supply — so your investment keeps working for years to come.
A Proven Process That Gets It Right First Time
1. Discovery & Site Survey
Every project starts with a detailed discovery meeting and (where required) a 3D site scan. This enables the capture of precise measurements and existing conditions - removing guesswork and reducing future rework.
2. Design Brief Workshop
We host a collaborative workshop with your key stakeholders to capture the vision, budget, and any technical or safeguarding requirements. This ensures your goals shape every stage of the design.
3. Space Planning & 2D Layouts
Our in-house design team produces 2D plans with up to three revisions, ensuring the layout is functional and fully compliant with educational or commercial standards.
4. Mood Boards & Finishes Selection
We propose tailored finishes and materials in a dedicated mood board considering durability, hygiene, aesthetics, and future maintenance - all aligned to your brand or building identity.
5. 3D Visuals & Walkthroughs
Using Autodesk Revit and 3D modelling, we provide sketches, renders, and even virtual walkthroughs (where required) - helping you visualise the finished space and avoid late-stage surprises.
6. Furniture & Specification Schedule
You receive a full FF&E specification and product schedule covering fitted joinery, loose furniture, and specialist equipment. This is so you know exactly what you’re getting, and where.
7. Full Fit-Out & Project Delivery
Once approved, we manufacture and install everything from flooring and ceilings to plumbing, furniture and final decoration. We deliver a complete turnkey space with no need for third parties.
8. Handover & Ongoing Support
After completion, we conduct a full handover and walkthrough, with warranty support and optional aftercare packages available. Your space is ready from day one - and supported long after.
Client Name | School Name