Food Technology Room Refurbishment in King’s Lynn, Norfolk
Litcham School desperately needed a total refurbishment of their existing food technology environment. The new room needed to help encourage new students to take up the food technology subject and be an attractive environment to learn in, as well as delivering all the practical requirements needed for lessons.
Litcham required the room to have a bright modern feel with new appliances and a dedicated area for teacher demonstrations and theory lessons. The room’s existing layout did not provide adequate storage areas for the preparation and teaching materials. There were minimal work surfaces for the students and insufficient works stations. Furthermore, students also were not facing the teacher when doing theory, which was less than optimal.

Insufficient Storage

Lack of Workstations

Poor Classroom Layout


How Brookhouse Transformed Litcham School's Food Technology Roomq
Brookhouse worked closely with the head of the department alongside the school’s business manager to reconfigure the room to achieve the best utilisation of space and satisfy the requirements within budget.
A chevron-style island design with a perimeter workstation provides the needed storage, work surfaces and workstations, as well as giving the room a new ‘wow’ feel. In order to be able to accommodate this design it required the structural wall at the end of the room to be removed.
By being creative with the layout and design, Brookhouse was also able to achieve a fantastic area for both theory and practical lessons. Students can now face the teacher during theory and have large work surfaces for the practical work.
The design also incorporates floor-to-ceiling storage along with tray storage to give the teachers plenty of space to organise their equipment. This bright, light, modern space with stylish blue finished handleless kitchen units creates the perfect impression and helps attract more students to take up the subject.

Trespa Worktops

Sleek Handleless Kitchen Units in Stylish Blue Finish

New Integrated Appliances Throughout

Teacher Demonstration Area

Updated Grid Ceiling and Lighting

Ground Works for Services to Islands
Everything You Need,
All in One Place
Consultation
We help you make confident, informed decisions with sector-specific advice, site audits, and layout planning — saving time, avoiding costly missteps, and unlocking smarter project outcomes.
Design
Our in-house team uses 3D site scans, Revit plans, and walkthrough visuals to show you exactly what you’re getting — before anything is built. That means better compliance, better function, and fewer surprises.
Financing Support
We offer funding guidance, grant application help, and asset finance options, plus our own Furniture Support Fund to reduce upfront spend and help you upgrade what matters most.
Refurbishment
(Full Fit-Out)
We deliver complete turnkey refurbishments, managing everything from rip-out and M&E to ceilings, floors, and decoration — all handled in-house for maximum control and minimal disruption.
FF&E Packages
We supply fully specified fitted and loose furniture packages tailored to each space — science labs, ICT rooms, classrooms, libraries and more — designed to perform for years to come.
Manufacture
All our fitted joinery and FF&E is made in our own UK facilities and certified to BS EN 16121: ensuring exact fit, shorter lead times, and long-term durability you can trust.
Installation
Our trusted installation teams deliver with speed, precision, and care. From fitted walls and washrooms to complete block refurbishments, we control the quality start to finish.
Aftercare & Support
We offer responsive aftercare, warranty management, future upgrades and loose furniture supply — so your investment keeps working for years to come.
A Proven Process That Gets It Right First Time
1. Discovery & Site Survey
Every project starts with a detailed discovery meeting and (where required) a 3D site scan. This enables the capture of precise measurements and existing conditions - removing guesswork and reducing future rework.
2. Design Brief Workshop
We host a collaborative workshop with your key stakeholders to capture the vision, budget, and any technical or safeguarding requirements. This ensures your goals shape every stage of the design.
3. Space Planning & 2D Layouts
Our in-house design team produces 2D plans with up to three revisions, ensuring the layout is functional and fully compliant with educational or commercial standards.
4. Mood Boards & Finishes Selection
We propose tailored finishes and materials in a dedicated mood board considering durability, hygiene, aesthetics, and future maintenance - all aligned to your brand or building identity.
5. 3D Visuals & Walkthroughs
Using Autodesk Revit and 3D modelling, we provide sketches, renders, and even virtual walkthroughs (where required) - helping you visualise the finished space and avoid late-stage surprises.
6. Furniture & Specification Schedule
You receive a full FF&E specification and product schedule covering fitted joinery, loose furniture, and specialist equipment. This is so you know exactly what you’re getting, and where.
7. Full Fit-Out & Project Delivery
Once approved, we manufacture and install everything from flooring and ceilings to plumbing, furniture and final decoration. We deliver a complete turnkey space with no need for third parties.
8. Handover & Ongoing Support
After completion, we conduct a full handover and walkthrough, with warranty support and optional aftercare packages available. Your space is ready from day one - and supported long after.
Client Name | School Name